No Upfront Cost Submeters


CWE is proud to announce a new program – SUBMETERS WITH NO OUT-OF-POCKET EXPENSE.

It’s high time that multihousing owners get some relief from the burden of ever-increasing water and sewer costs as well as high electricity and gas bills. Get out from under the burden of high water consumption. Motivate your residents to conserve.

Fill out the blue form to the right . In the blank labeled “Other Description,” write in “no cash.”


Miami Requires Submeters


Two multi-housing projects – different owners – in Miami-Dade have recently approached us with the same problem. The general contractors of these projects had not budgeted for submeters because in both cases, the MEP had not included submeters in the schematics.

It was not until these properties had displayed mock-up units to their respective Miami-Dade inspectors that they became aware that submeters are required:

Section 5. Section 8A-381 (c) of Miami-Dade County:
The provisions of this article shall apply to multiple unit properties utilizing water services. Effective July 1, 2008, all permit applications for new multi-family residential developments shall be required to include a submeter for each individual dwelling unit.

The vast majority of GCs and multifamily owners in South Florida have been aware of this for years. But in these two cases, the GCs and owners had not previously built multihousing in Miami-Dade.